Pusuno´s hyroelectric, of 39,5 MW, is located in Napo provine taking into 

advantage the natural forcé of Pusuno river.

The Project has two powerhouses in cascade: 

CENTRAL-1 22,7 MW 

CENTRAL-2 16,8 MW.

The intake is at 755 msnm, the water restitution level is at

382 msnm and the design flow is  12m3/s

The 90% of the civil work will be constructed on rock, ensuring the geological stability.

ELIT ENERGY have istalled an 

automatic flow measuring probas, which collect data every 30 minutes the actual river amount of water.