

Pusuno´s hyroelectric, of 39,5 MW, is located in Napo provine taking into
advantage the natural forcé of Pusuno river.



The Project has two powerhouses in cascade:
CENTRAL-1 22,7 MW
CENTRAL-2 16,8 MW.
The intake is at 755 msnm, the water restitution level is at
382 msnm and the design flow is 12m3/s
The 90% of the civil work will be constructed on rock, ensuring the geological stability.
ELIT ENERGY have istalled an
automatic flow measuring probas, which collect data every 30 minutes the actual river amount of water.
